Street Improvement Projects
Asphalt to be Completed in 2026
Note: Due to excessive flooding and infrastructure damage in Spring 2025, only necessary road repairs were made in 2025. This projected list has many of the streets that were scheduled for repair in 2025 for the 2026 season.
*E Street between Main Street and Ash Avenue
*F Street and Beech Avenue
*K Street between Chestnut Avenue and Fir Avenue
*H Street between Chestnut and Fir Avenue
*Demolay Avenue between I Street to G Street
*Pine Avenue between C Street and D Street
*Fir Avenue between D Street and B Street
*Cedar Avenue between B Street and D Street
*Hackberry Avenue between B Street and 2nd Street
* Hickory Avenue between 2nd Street and E Street
*Beech Avenue between 3rd Street and 5th Street
*Cypress Avenue between 12th Street and 13th Street
*Poplar Avenue between 13th Street and 15th Street
*5th Street between Main Street and Oak Avenue
*13th Street between Peach Avenue and Peck Avenue
*Stewart Avenue
2025 Street Striping Project
Street striping began Sept. 29, 2025, with a total cost of $200,000. A list of streets is below:
Asphalt Completed in 2025
*11th Street between Stephens Avenue and Duncan Avenue
*Grand Avenue between Elk Avenue and Stewart Avenue
*Stewart Avenue between Grand Avenue and Crescent Avenue
CDBG Road Grant- 2024 Project
The road reconstruction project funded by the dedicated ¼ cent for infrastructure of the ½ cent sales tax, along with a matching CDBG grant that was awarded, kicked off in the southeast area of the City of Duncan in April. These 40 blocks are completed, as well as an additional 63 blocks, during the 2024 asphalt season.
Asphalt Completed in 2024
*12th Street between Highway 7 and Bois D'Arc Avenue
*42nd Street between Elk Avenue and Plato Road
*Plato Road between 42nd Street and Highway 7
*Tanglewood Drive between 5th Street and Odom Drive
*Odom Drive to Walnut Hill Drive
*Redwood Drive
*Day Street to Osage Road
*Blackjack Lane between 5th Street and Day Street
*Ponderosa Road to Camelback Road
*Walnut Hill Drive
*Woodside Drive
*Fawn Brook Drive
*Cox Street
*Allen Street
*Duncan Avenue between 8th Street and 11th Street
*Stephens Avenue between 8th Street and 10th Street
*Woodlawn Avenue between 8th Street and 10th Street
*Jefferson Avenue between 7th Street and 9th Street
*9th Street between MLK Jr. Avenue and Highway 7
*8th Street between MLK Jr. Avenue and Stephens Avenue
*7th Street between Park Avenue and MLK Jr. Avenue
*Duncan Avenue between 13th Street and 15th Street
*Woodlawn Avenue from 8th Street west
*Park Avenue between 8th Street and the railroad
*Stephens Avenue between 8th Street and Bois D'Arc Avenue
*14th Street between Park Avenue and Highway 7
*10th Street between Woodlawn Avenue and MLK Jr. Avenue
*Washington Avenue between 10th Street and 11th Street
*Resthaven Memorial Gardens- all roadways within the grounds of the cemetery
Asphalt Completed FY 2021-2024
Asphalt Completed in 2023
*14th Street between Maple Avenue and Pecan Avenue
*15th Street between Maple Avenue and Pecan Avenue
*11th Street to 15th Street on Elm Avenue
*11th Street to 15th Street on Pecan Avenue
*14th Street to 15th Street on Sycamore Avenue
*14th Street to 15th Street on Poplar Avenue
*10th Street to 13th Street on Mulberry Avenue
*6th Street between Spruce Avenue and Hickory Avenue
*4th Street between Elder Avenue and Hackberry Avenue
*5th Street to 6th Street on Cedar Avenue
*2nd Street to 3rd Street on Cedar Avenue
* 2nd Street to 3rd Street on Spruce Avenue
*3rd Street between MLK Jr. Avenue and Carver Avenue
*King Place between MLK Jr. Avenue and Carver Avenue
*Sharp Avenue between King Place and 4th Street
*Pecan Avenue between 5th Street and King Place
*Mulberry Avenue between 7th Street and 8th Street
*Main Street between D Street and I Street
*Walnut Avenue between D Street and 3rd Street
*F Street between Main Street and Ash Avenue
*Beech Avenue between F Street and 1st Street
*Beech Avenue between B Street and F Street
*Ash Avenue between B Street and F Street
*Ash Avenue between B Street and 2nd Street
*Ash Avenue between 2nd Street and 3rd Street
*Oak Street between B Street and D Street
Asphalt Completed in 2022
* 8th Street between Cherry Avenue and Peach Avenue
*8th Street from Elder Avenue to Peach Avenue
*7th Street to 8th Street on Cherry Avenue
*Gaitlin Road bridge
*7th Street between Cedar Avenue and Hackberry Avenue
*Oak Avenue between 1st Street and 6th Street
*Walnut Avenue between 5th Street and 6th Street
*Walnut Avenue between 12th Street and 14th Street
*Airport
*8th Street to 9th Street on Pine Avenue
*12th Street to 14th Street on Willow Avenue
*A Street to B Street on Ash Avenue
*B Street from Main Street to Elm Avenue
*8th Street from Cypress Avenue to Sycamore Avenue
*A Avenue between 17th Street and 18th Street
*17th Street between Oak Avenue and Beech Avenue
*12th Street from Park Avenue to Woodlawn Avenue
*11th Street to 13th Street on Duncan Avenue
*Stephens Avenue from 11th Street to 12th Street
*G Street from Main Street to Ash Avenue